Sunday 25 February 8:00pm until Friday 2 March 6:00am.
Haulage of cables for traffic signals is required within the median.
Traffic changes:
- The intersection will be closed to traffic turning right into Flemington Road from Well Station Road, and all through traffic along Well Station Drive
- Left turn at Well Station Road into Flemington Road will be maintained
- Traffic travelling northbound and southbound on Flemington Road will be maintained
- Detours will be sign-posted, with traffic management in place and highly visible throughout the works.
Additional Information:
The equipment and plant to be used includes light vehicles, light towers and a hauling winch. Due to the nature of the work, some of the activities will be noisy.
The construction team will limit these impacts wherever possible by reducing the number of machines operating at the same time and turning off equipment when not in use. Noise blankets will be installed where practical. Non-tonal reversing beepers will be used, and workers will be instructed to keep noise to a minimum.