Out of hours works will take place at the intersection of Mapleton Avenue and Flemington Road from 21st June. Northbound and southbound traffic will be reduced to one lane in each direction and right turns will not be permitted into Mapleton Avenue. From 8pm – 6am only northbound traffic will be diverted onto Manning Clark Crescent – no access onto Flemington Road.
The scope of works is Preparatory works ahead of laying of rail need to occur within and adjacent to Mapleton Avenue intersection on Flemington Road. This includes cutting of the existing road surface, removal of spoil, installation of new drainage and re-surfacing. Other works include installation of electrical conduits for traffic signals and traffic light footings and bases.
There will be road detours in place to divert vehicle traffic and buses at night. Traffic management will be in place and highly visible throughout the works, including signage and personnel.
The following equipment will be used during these works:
- Road saws, excavators, vacuum excavator truck, water truck, asphalt paver, asphalt profiler and compaction equipment including roller and vibration plates
There will be noise associated with this work however every effort will be made to minimize disruption to residents.
If you have any questions related to works in your local area or the wider project, please contact Canberra Metro on 1300 208824 or email [email protected]